Overland Park KS – Children’s Mercy
Children’s Mercy South had been dealing with active leaks through the original building, built in 1997, and the addition, built in 2004. Through investigation, MCR discovered that both buildings had faulty through wall flashings which was allowing significant leaks. MCR was hired to replace the through wall flashings; replace the exterior joint sealants; repair and waterproof the EIFS areas. The areas that have been completed thus far are leak free for the first time since the buildings were built.