Moon Block Building – Red Cloud, NE

The First United Methodist Church in Ozark Arkansas had accumulated significant biological staining on its stone facade. MCR was hired to clean the exterior facade; repoint deteriorated mortar joints; repair deteriorated stone units; re-caulk the windows; and apply a polyurethane traffic coating at the entryway.